Reconciling check-in data after the event

The doors are closed, and the scanner export, the manual log and the registration list all show slightly different numbers.

Discuss check-in reconciliationOpens WhatsApp with a draft you can edit before sending. Nothing is sent automatically.

The short answer

Reconcile in one pass: start from registrations, add walk-ins, apply scans and the manual log, and account for each difference with a reason and a source. The result is one attendance figure and a short list of unexplained items.

Do the work within a day or two, while desk staff still remember the exceptions. Share the figure with finance, catering and sponsors only in the form the purpose requires.

The sources to bring together

SourceWhat it tells youTypical gap
Registration listWho was expected, by category.Cancellations and transfers not updated.
Scanner exportWho scanned and when.Duplicate scans, scanner failures.
Manual logWho was admitted without a scan.Illegible or missing times.
Walk-in and exception logsApproved extras and decisions.Not matched to a badge.
Session scansWho entered each room, if scanned.Different counting rules from the main check-in.

How to reconcile

  1. Freeze copies of every source with the time of export.
  2. List each registered person and mark scanned, manual, no-show or cancelled.
  3. Add walk-ins from the log, one row each, with the approver.
  4. Remove duplicate scans, keeping the first and noting the second.
  5. Write a reason next to every difference between sources, or mark it unexplained.

Definitions to fix first

  • Attended means checked in at least once on the first day, unless your purpose needs otherwise.
  • No-show means registered, not cancelled, and not checked in anywhere.
  • Substitute counts as attended, under the substitute's name, with the original registrant noted.
  • State the definition on the report so it is read the same way later.

Uses of the figure

Catering will want the count compared with what it served; see dietary count reconciliation. Sponsors and committees should receive aggregates unless a named list is justified and agreed with your privacy contact.

Keep the reconciliation file with the manual log, and decide with the privacy contact when each will be deleted.

Worked example · Fictional example

Four numbers that became one

Fictional organisation and figures, illustrative only.

A fictional association has 320 registered, 14 walk-ins, 292 scans and 11 manual check-ins. After removing 5 duplicate scans and 6 registrations cancelled by email, attendance is 292 scans minus 5 plus 11 manual plus 14 walk-ins, which is 312.

Two names remain unexplained: they scanned but the registration list shows them cancelled. The secretariat contacts both, learns they transferred places, and updates the record. The final report lists the figure, the definition used and the two corrections.

Use this yourself

Check-in reconciliation sheet

Use one row per person, and a summary at the top. Fill in the summary last.

LineCountSource and note
Registered at closeRegistration export time:
Cancelled before the eventSource:
Scanned (unique)Duplicates removed:
Manual check-insLog sheet numbers:
Walk-ins admittedApproval log:
SubstitutesSubstitution log:
No-showsDefinition used:
Attendance figureCalculated by (name, date):
Unexplained itemsAction and owner:

Open the tool: Event check-in throughput estimator

Handle it in-house, or bring in help?

Your team can usually handle this when

  • One registration source and a clean scanner export.
  • A few exceptions, all logged at the desk.
  • You only need the headline figure.

Outside planning help earns its fee when

  • Several registration sources or multiple events to merge.
  • Sponsors, a professional body and finance each need different figures.
  • Desk logs were kept in different formats or not kept.

Want the reconciliation done and the figures signed off?

A conference project lead can collect the exports and logs, reconcile them to one figure with a clear definition, and agree with finance and the committee who receives which version. Share your sources and report needs to discuss the scope.

Discuss check-in reconciliationOpens WhatsApp with a draft you can edit before sending. Nothing is sent automatically.Conference project lead

Questions organisers ask

When should we reconcile?

Within a day or two while the desk staff remember the exceptions. Freeze copies of every source first.

What if numbers cannot be matched?

List them as unexplained with an owner and a date, rather than adjusting the figure to fit.

Do we share the raw scan list?

Share aggregates unless a named list is justified. Ask your privacy contact; see also session scanning.