Planning practical exercises within a professional seminar
You want participants to practise, but the programme is full of talks and the exercise keeps getting squeezed to ten minutes.
The short answer
Treat each exercise as a session with its own outcome, instructions, materials and debrief. A useful rule of thumb is that instructions, doing and debrief each need protected time, and the debrief is the part most often cut.
Decide the exercises first, then fit the talks around them, and test the day's timings before the programme is published.
What an exercise needs
| Element | Question to answer | Usually owned by |
|---|---|---|
| Outcome | What can participants do after it? | Education owner |
| Instructions | Can they be given in under three minutes? | Facilitator |
| Group size | How many per group, and who forms the groups? | Facilitator |
| Materials | What is printed, shared digitally or brought by participants? | Education owner, with the project lead tracking deadlines |
| Room | Tables, wall space, power and noise between groups | Venue confirms what the room supports |
| Debrief | Who summarises, and how long is protected? | Facilitator |
Sequence for planning exercises
- List the outcomes that need practice rather than explanation, using the approach in designing around learning outcomes.
- Choose one exercise type per outcome: case analysis, drafting, role-play or peer review.
- Assign a facilitator for each group of about the size the room and format support, and brief them on the exercise.
- Write timings in three parts: instructions, doing, debrief. Add the change-of-room or re-seating time.
- Check total timings with the programme duration checker, including breaks and buffers.
- Prepare materials and a spare set, and send any pre-work with a deadline.
Failure points
- An exercise with no debrief, so participants do not connect it to the outcome.
- Instructions longer than the activity, which loses the room.
- Groups too large for everyone to contribute, or mixed levels left unmanaged (see handling different levels of prior knowledge).
- Materials printed late or in the wrong quantity.
- A theatre layout in a room that cannot be re-set in the time allowed.
Online or hybrid participants
If some participants join remotely, decide whether they have their own groups or join mixed ones. Ask the audio-visual supplier whether breakout rooms are available and who moderates them.
Worked example · Fictional example
A fictional procurement association exercise
Fictional organisation and figures, for illustration only.
Persatuan Fiktif Perolehan Profesional plans a 90-minute exercise block in a one-day seminar for 60 participants on evaluating tender responses.
The planner divides it into 10 minutes of instructions, 45 minutes in six groups of ten, and 25 minutes of debrief, leaving 10 minutes for re-seating. The facilitator notes that groups of ten were too large and the education owner agrees to ten groups of six after checking the room.
Use this yourself
Exercise planner
One row per exercise. A blank cell is a question for the education owner.
| Exercise | Outcome served | Instructions (min) | Doing (min) | Debrief (min) | Group size and facilitator | Materials and deadline |
|---|---|---|---|---|---|---|
| Example: score two tender responses | Compare responses against criteria | 10 | 45 | 25 | 6 per group, one facilitator each | Printed scoring sheets, final by two weeks before |
Handle it in-house, or bring in help?
Your team can usually handle this when
- The facilitator has run the exercise before and can run it alone.
- The room layout is simple and fixed.
- Materials are small and prepared by one person.
Outside planning help earns its fee when
- Several exercises across the day with different facilitators and materials.
- Room re-setting, equipment and printed materials must be coordinated with the venue.
- Exercises happen both in the room and online.
Want exercises written into a workable plan?
An Event Blueprint can put your exercises into a session plan with timings, facilitator briefs, layout requests for the venue and a materials schedule. The exercise content and facilitation stay with your education owner.
Questions organisers ask
How much time should an exercise get?
There is no fixed amount. Ask the facilitator how long the exercise really takes with a group, then add instruction and debrief time.
Who forms the groups?
Decide in advance. Pre-assigned groups save time, while self-selected ones can leave clusters of the same employer or level.
What if participants arrive without the pre-work?
Plan a short fallback version and tell the facilitator, so the exercise still works.