Event stage entry and exit map

Two speakers meet in the wings at the changeover, and one of them cannot find the steps in the dark.

Discuss stage movementsOpens WhatsApp with a draft you can edit before sending. Nothing is sent automatically.

The short answer

A stage entry and exit map shows, for each group on the programme, where they wait, which side they enter, where they stand and which way they leave. It also names who guides them.

The map is a coordination tool. The stage supplier and the venue confirm the physical routes, steps, lighting and anything that touches safety or access.

Draw the stage and the wings first

Start with a simple plan of the stage, with left and right named from the performer's view, any steps or ramps, the lectern position, and the places backstage where people can wait.

Ask the stage supplier and the venue for the plan, and confirm which routes are usable on the day. Do not assume.

One line per group

List every group that goes on stage: emcee, speakers, panels, award presenters, award recipients, performers, VIPs. Give each a wait point, an entry, a position and an exit.

GroupWait pointEntersStands or sitsExitsEscort
EmceeStage left wingLeftLectern or stage centreLeftStage manager
Keynote speakerHolding area, then stage right wingRightLecternRightRunner
Panel of fiveHolding area, then wingLeft, moderator firstSeated, positions agreedRightStage manager
Award recipientsReserved seats near the front, then the stepsLeftMarks agreed with the presenterRightUsher
VIP guestGreen room, then wingRightAgreed positionAgreed exitNamed staff member

Questions for the venue and stage supplier

  • Which steps, ramps and routes may be used, and which must stay clear?
  • Is there lighting in the wings and on the steps for people who cannot see the stage?
  • Do any guests need a step-free route or other assistance, and how will it be provided? Ask each guest in advance.
  • Where may equipment, cases and costumes be placed so routes stay clear?
  • Who is the venue contact for any safety question during the event?

Use the map

  1. Put the map on the wall of the holding area and in the stage manager's folder.
  2. Walk each group through their line at rehearsal. See stage movement walkthrough.
  3. Add entry and exit timings to the run-of-show so changeovers are realistic.
  4. Update the map if the stage setup changes, and tell everyone.

Worked example · Fictional example

Awards evening with eight presenters and sixteen recipients

Fictional organisation and figures, for illustration only.

Persatuan Industri Fiktif has an awards segment with presenters entering from the right and recipients from the left.

The secretariat finds in the walkthrough that recipients leaving on the left meet the next group heading on. The map is changed so all recipients exit right, and an usher is placed in the wing. One guest who uses a wheelchair is asked in advance what they need, and the venue is asked what step-free route is available.

Use this yourself

Stage entry and exit sheet

Copy this into your stage plan and add one line for each group.

  1. Group
  2. Wait point
  3. Entry side
  4. Position on stage
  5. Exit side
  6. Escort
  7. Needs checked with venue or stage supplier
GroupWait pointEntersPositionExitsEscortCheck with venue

Open the tool: Event run-of-show builder

Handle it in-house, or bring in help?

Your team can usually handle this when

  • A simple stage with one entry on each side and few groups.
  • The venue gives you a stage plan and a named contact.
  • The programme has few changeovers.

Outside planning help earns its fee when

  • Awards, panels, VIPs and performers share the stage and the wings are tight.
  • Some guests need specific arrangements that must be confirmed in advance.
  • You want one person to build the map, run the walkthrough and brief the escorts.

Need the stage movements mapped and briefed?

A conference project lead can draw up the map with your stage supplier, collect guest needs, brief the escorts and walk the groups through at rehearsal. Physical safety, access and structures stay with the venue and the qualified suppliers.

Discuss stage movementsOpens WhatsApp with a draft you can edit before sending. Nothing is sent automatically.Conference project lead

Questions organisers ask

Who produces the stage plan?

Usually the venue or the stage supplier. Ask them for a plan with dimensions, and mark up your map from it.

How do we handle guests who need assistance?

Ask each guest in advance what they need, and put the question to the venue and the stage supplier. Do not decide for the guest.

Do we need a map for a small event?

A simple one still helps when more than two groups use the stage. Keep it to one page.