Accessibility and language inclusion
Event quiet-space planning
Some delegates will want a calmer room to rest, make a call or step away from noise, and someone has to decide where it is and how it works.
Opens WhatsApp with a draft you can edit before sending. Nothing is sent automatically.
The short answer
A quiet space is a room or corner set aside for low noise and low stimulation, with clear rules on how long people may stay and who looks after it. Decide its purpose first, then its location, its set-up, its rules and who is responsible.
Confirm the room with the venue in writing, including any limits on use. Ask a qualified access adviser if you want a view on the set-up; do not describe the space as meeting any standard unless a competent party says so.
Decide the purpose
A quiet space can serve several uses: resting, a short private call, prayer or reflection, or time away from sensory load. Name the main purpose and the others you will allow, because the rules depend on it.
If another room already serves prayer or nursing, link to it rather than combining uses without checking with the people concerned.
Location, set-up and rules
| Decision | Options | Question for the venue or adviser |
|---|---|---|
| Location | Away from plenary speakers, catering and queues, on the delegate route | Which rooms are free for the full event, and what noise comes through the walls? |
| Set-up | Seating, soft lighting if possible, a table, water, minimal signage | Can lighting be dimmed, and can furniture be changed? |
| Rules | Maximum stay, no calls or a call corner, phones on silent | How will staff or hosts manage the space during peak times? |
| Staffing | A named host on a rota, or self-service with a contact number | Who covers breaks, and who can be called if help is needed? |
| Signage and wayfinding | Clear sign from the main route, with plain words | Can the sign be placed on the route without blocking it? |
| Privacy | No registration or record of who enters | Is the door closed from view, and how is privacy kept? |
Sequence
- Choose the purpose and ask the venue for two or three candidate rooms.
- Visit each room at the loudest planned time, or ask the venue for the neighbouring uses.
- Agree the room, set-up and opening hours in writing with the venue.
- Write the rules in a few plain lines and place them at the door and in the delegate guide.
- Brief hosts and the registration desk, and plan a quick check of the room every hour.
What to leave out
- Do not ask people to register or explain why they use the space.
- Do not describe it with health labels in the programme.
- Do not promise a noise level; say how the room is set up and what it is next to.
Worked example · Fictional example
Quiet space for a two-day regional forum
Fictional organisation and figures, for illustration only.
A fictional council of professional bodies runs a two-day forum with about 400 delegates. It asks the venue for a meeting room away from the catering area, set up with seats, lamps and water.
The rules are posted at the door and the secretariat staff check the room hourly. The venue agrees the room for both days and a staff member holds the key on a rota.
Use this yourself
Quiet-space planning checklist
Copy this and fill in. Mark each as agreed with the venue or open.
- Main purpose and other uses allowed:
- Room chosen, and what is on the other side of each wall:
- Opening hours and who opens and closes it:
- Set-up: seating, lighting, table, water, bin:
- Rules in plain words, as displayed at the door:
- Host or rota, and a contact if help is needed:
- Signage text and placement on the route:
- How privacy is kept, with no registration or record:
- Hourly check: who and what is checked:
- Link to the delegate guide and the programme mention:
Handle it in-house, or bring in help?
Your team can usually handle this when
- The venue has a spare room near the main route and a secretariat that can staff it.
- The event is small and rules can be simple.
Outside planning help earns its fee when
- Large or multi-floor events needing several spaces and a rota.
- The venue cannot offer a suitable room and alternatives need negotiation.
- You want a qualified access adviser's view on the space.
Want a quiet space written into the venue plan?
An Event Blueprint can set out the purpose, room options, venue requests, rules, hosting rota and signage so the quiet space is agreed with the venue and briefed to staff. Share your venue and floor plan.
Questions organisers ask
Should delegates register to use the quiet space?
No. Registration adds a barrier and a record. Use a host and a sign, and keep the rules short.
Can we use a prayer room as a quiet space?
Check with the venue and the people who use the prayer room. Combining uses can work but should not be assumed.
Can we promise the space meets a standard?
No. Describe the set-up and its limits, and leave any assessment to a competent party.
Related resources
Content record: Draft. Written from the cited sources and checked by automated rules; not yet independently reviewed.