The programme is ready, and now crates of signage, registration materials and supplier equipment need a way into the room.

Opens WhatsApp with a draft you can edit before sending. Nothing is sent automatically.

The short answer

Walk the route that goods will take, from the road to the event room, and ask the venue to confirm in writing the entrance, the access windows, the rules and who controls each door and lift.

Many venue problems on set-up day come from one unasked question: what stands between the vehicle and the room.

Trace the whole route

Start where a vehicle stops and follow the path in the same order as the goods: unloading point, entrance, corridor, lift or ramp, event room. Check each point for width, steps, door type and floor surface.

Ask the venue's operations contact to walk it with you. They know which doors are normally locked and which lift is the service lift.

What to ask about

Loading questions and the evidence to keep
TopicAsk the venueEvidence
Unloading pointWhere may vehicles stop, for how long, and is it shared with other events or deliveries.Photo of the point and written statement of the rule.
Access windowsOn which days and times can set-up, load-in and load-out happen, and are there restrictions.Written schedule from the venue.
Route and liftsIs there a service lift or ramp, who operates it, and is there a limit on size or weight of items.Photos and the limits stated by the venue.
Doors and securityWho unlocks the doors, what ID or booking reference is needed, and is access staffed.Named contact and written arrangement.
StorageCan materials be delivered in advance and held, and who is responsible for them.Written agreement with date and responsibility.
Waste and packagingWhere do crates, packaging and waste go, and what is the venue's rule.Written rule, and an agreed removal time.
Charges and approvalsDoes the venue require notice, approval or a fee for any of this.Written quote or confirmation, filed with the booking.

Match the route to what you bring

List the largest and heaviest item each supplier will bring, and any item that needs special handling. Ask the supplier, not the organiser, to confirm that their items fit the route and the limits the venue states.

For specialist production equipment, your suppliers' own requirements drive the questions. Pass the venue's written answers to them directly.

Write the loading plan

  1. Fill in the loading plan below for each supplier and each delivery.
  2. Send it to the venue operations contact and ask them to confirm or amend it in writing.
  3. Share the confirmed plan with each supplier and name one person on site who holds it.
  4. Check the first delivery against the plan, and note any change in the evidence log.

Worked example · Fictional example

A fourth-floor room with one lift

Fictional organisation and figures, for illustration only.

A fictional association plans a conference on an upper floor. On the visit, the team finds that the main passenger lift is open to the public, and the service lift is shared with the venue's kitchen at set times.

The venue confirms in writing a morning delivery window, names the person who operates the service lift and agrees that packaging is removed by the end of the day. The team moves the heavy registration crates to a morning slot and asks the AV supplier to confirm their equipment against the lift limits the venue gave.

Use this yourself

Venue loading plan

Copy this table into a spreadsheet and send it to the venue for confirmation.

DeliverySupplier or ownerItems and special handlingDay and time windowRoute usedVenue contactConfirmed in writing?
Registration materialsOrganiserCartons, bannersTo be agreed with venueUnloading point, service liftTo be namedNo
Stage and screensProduction supplierLarge equipment, supplier to confirm sizeTo be agreed with venueTo be confirmedTo be namedNo
Catering suppliesCatererPer catererTo be agreed with venueKitchen routeTo be namedNo
Load-out and waste removalAllPackaging, cratesEnd of event daySame routeTo be namedNo

Open the tool: Event venue inspection checklist builder

Handle it in-house, or bring in help?

Your team can usually handle this when

  • Deliveries are small and mostly from the organiser's own team.
  • The venue has a clear loading procedure and a contact who confirms it in writing.
  • You can brief the suppliers yourself.

Outside planning help earns its fee when

  • Several suppliers arrive at the same time and need separate windows.
  • The route is long, multi-floor or shared with other events.
  • A committee wants the loading arrangements checked as part of venue selection.

Want loading and access arranged with the venue?

An Event Blueprint can set out supplier requirements, the loading plan and the written confirmations to request from the venue. A project lead can coordinate the venue and suppliers on timings and keep the confirmed plan with the right people. Supplying or managing technical production is not part of the service.

Plan your venue loading accessOpens WhatsApp with a draft you can edit before sending. Nothing is sent automatically.Event Blueprint (planning pack)

Questions organisers ask

Who should confirm that equipment fits the route?

The supplier who brings it, checking against the limits the venue states in writing. The organiser's role is to collect the answers and keep them in one place.

What if the venue's loading time conflicts with set-up needs?

Raise it before booking and ask for alternatives in writing. Time limits that cannot move belong in the venue comparison.

Do I need to ask about loading if my materials are small?

Still ask where materials can be delivered in advance and who receives them. Even small deliveries need a named person and a place.