Venue selection and inspection
Technical infrastructure questions to ask an event venue
Your AV supplier needs facts about the room, and the venue's sales sheet does not contain them.
Opens WhatsApp with a draft you can edit before sending. Nothing is sent automatically.
The short answer
Technical infrastructure is a set of facts that only the venue can state: what power is available in the room, what may be hung or fixed, which house equipment is included, who must operate it and what the rules are for cabling and working hours. Ask for each answer in writing, from the venue's technical contact, not the sales team.
Your organiser role is to collect the answers and pass them to the AV supplier. Whether a rig or setup is structurally safe is for the venue and the supplier to confirm, not for this page.
Who to ask, and who needs the answers
Ask for the venue's technical or operations contact early, before the contract is signed. Sales staff can describe a room but rarely own its technical limits.
Pass every answer to the AV and production suppliers as soon as it arrives, so they price and plan against the same facts. Internet needs sit with venue internet requirements and noise with noise and neighbouring activity.
The question pack by area
| Area | Questions | Evidence to request |
|---|---|---|
| Power | What power supply can be used in the room, how is it distributed and who connects to it? Are there separate circuits for production? | Venue technical specification or power plan |
| Rigging and fixing | What may be hung from the ceiling or fixed to walls and floors, and who approves and carries it out? | Written rigging and fixing policy |
| House AV | Which screens, projectors, microphones and sound are included, and in what condition? Who operates them? | Equipment list with the venue's technician named |
| Lighting and light control | Can the room be darkened? What lighting control exists, and who operates it? | Room description and a check during the site visit |
| Cabling routes | Where can cables run, and what covering or routing does the venue require? | Written cabling rules |
| Working rules | Are in-house technicians or approved suppliers mandatory? What are the permitted working hours and any extra charges? | Contract clause or technical rider |
| Climate and acoustics | Who controls room temperature? Are partition walls between rooms and how is noise managed? | Venue statement and a visit at a similar hour |
| Contingency | What backup arrangements exist for power, network and equipment faults on the day? | Written description and an on-site contact |
How to run the conversation
- Send the question pack in advance and ask for written answers, not a call alone.
- Attend the site visit with your AV supplier if possible, so they see the room against their own checklist.
- Record each answer with the name of the person, the date and the document, using the site inspection checklist builder.
- Mark any answer that conflicts with the sales sheet and ask the venue to resolve it in writing.
- Re-confirm the key answers shortly before the load-in, because rooms and rules change.
Common traps
- Assuming a house screen or sound system is included because the room photos show one.
- Learning only at load-in that venue technicians are mandatory and charged separately.
- Rigging points quoted by the sales team and later denied by the technical team.
- Cable rules that force an expensive rerouting on the day.
- A technical rider that sits in an attachment nobody read before signing.
Worked example · Fictional example
Technical questions for a two-room seminar
Fictional organisation and figures, written to show the method.
A fictional medical-device trade association plans a seminar with a plenary and one breakout room. The secretariat sends the question pack to the venue's technical contact and a copy to its AV supplier, who adds three questions of its own.
The venue replies that in-house technicians must operate the house sound system but that outside suppliers may bring their own screens. The secretariat records both statements with dates and asks the venue to confirm the cabling rule in writing before it signs. The supplier updates its plan once the replies arrive.
Use this yourself
Venue technical question pack
Copy this list into an email to the venue's technical contact. Add your AV supplier's questions before sending.
- What power supply is available in each room, and who connects production equipment to it?
- What may be hung, fixed or taped, and who approves it? Please send the written policy.
- Which house AV equipment is included in the quote, and which items are chargeable?
- Are venue technicians mandatory? If so, for which equipment, and at what stated charge?
- Can the rooms be darkened, and who operates the lighting controls?
- What are the cable routing and covering rules?
- What working hours apply for load-in and load-out?
- Who controls room temperature and how are requests handled on the day?
- What backup arrangements exist for power or network faults?
- Who is the named technical contact on the event days, and how can we reach them?
Handle it in-house, or bring in help?
Your team can usually handle this when
- The event is a single plenary room with simple AV and a supplier you already trust.
- One person can send the pack and chase written answers.
- The venue has a clear technical specification it can send.
Outside planning help earns its fee when
- Several rooms, hybrid delivery or live streaming depend on the venue's answers.
- The venue's sales and technical teams give different answers.
- You need someone to turn the answers into supplier requirements and track what is still open.
Want the technical questions turned into supplier requirements?
An Event Blueprint can set out which technical questions go to the venue, which go to your AV supplier, who owns each answer and by when, then turn the replies into written supplier requirements. Send the venue and room list you are considering and any AV quote you have already received.
Questions organisers ask
Do I need a technical person to ask these questions?
No. You can send the pack as it is. Your AV supplier can review the answers and add questions of its own.
What if the venue will not answer in writing?
Record the verbal answer with the name and date, and ask the venue to confirm it by email. Treat anything unconfirmed as unknown.
Who decides whether a rig is safe?
The venue's technical team and your qualified supplier. This page helps you ask the questions and keep the records.
Should I ask the same questions of every shortlisted venue?
Yes. Using the same pack gives you answers you can compare fairly.
Related resources
Content record: Draft. Written from the cited sources and checked by automated rules; not yet independently reviewed.