Skip to content
EventConsultant

Accounting, audit and assurance programmes

Planning concurrent audit and accountancy tracks

Accountants and auditors share one conference but not one interest, so parallel tracks help only if delegates can really follow their own path.

Opens WhatsApp with a draft you can edit before sending. Nothing is sent automatically.

The short answer

Start from the delegate groups and what each needs to attend across the day, then build tracks around them. Check each slot for clashes between sessions that the same group would want, size rooms from pre-selection rather than guesswork, and publish the grid early.

If sessions carry professional learning credit, ask the professional body how credit is recorded per session and whether moving between rooms affects it. Keep that separate from the track design itself.

Tracks follow people, not topics

A topic list produces tracks that look tidy but split the audience badly. Begin with who attends: audit practitioners, financial reporting and accounting staff, practice owners, public sector finance teams, newcomers.

For each group, write the three or four sessions it must not miss. These are the sessions that must not run at the same time.

A track grid with clash checks

SlotTrack A: audit and assuranceTrack B: reporting and accountingTrack C: practice and peopleClash check
Morning 1Audit practice update.Reporting update.Practice management.Audit practitioners and reporting staff both need the first two.
Morning 2Technology in audit.Reporting case discussion.Newcomer clinic.Newcomers should not clash with core updates.
Afternoon 1Quality and review.Group reporting workshop.Succession and growth.Practice owners need Track C and one update.
Afternoon 2Roundtable on engagement challenges.Roundtable on reporting challenges.Open plenary.Plenary closes the day for everyone.

Sequence for building the grid

  1. List delegate groups and the sessions each must not miss.
  2. Place the must-attend sessions in different slots across tracks, or repeat them where the programme committee agrees.
  3. Estimate room demand from a short pre-selection at registration and size rooms by it.
  4. Plan changeover time of at least one full break between slots so people can move rooms.
  5. Publish the grid and ask the committee to confirm that no key group is forced to choose between two must-attend sessions.

Room and logistics questions

  • Which sessions are likely to be over-subscribed, and is there a fallback room or overflow screen?
  • How will delegates select sessions: pre-selection, free choice or fixed assignment?
  • Are there accessibility needs that decide which rooms are used for which sessions?
  • Who moderates each room and keeps time?
  • How will delegates find their room and see changes on the day?

If sessions carry learning credit

Ask the professional body whether credit is given per session attended, how attendance is recorded for each room and whether a late arrival affects credit. Put the answers in the delegate briefing.

The mechanics of recording are in coordinating professional learning records.

Worked example · Fictional example

A fictional accountancy conference

Fictional organisation and figures, for illustration only.

The fictional Persatuan Perakaunan Contoh plans a one-day conference for about 300 delegates with three tracks and four slots. Registration asks each delegate to pick a preferred session per slot.

Pre-selection shows that 140 want the audit practice update, 110 the reporting update and 50 the practice management session. The committee moves the audit update to the larger room and puts the reporting update in a mid-size room.

The first draft put the newcomer clinic opposite the core reporting update. The committee moves it to the second morning slot, and adds a full 30-minute break between slots for room changes.

Use this yourself

Track grid and clash worksheet

Copy this table, add a row per slot and confirm it with the programme committee before the programme is published.

SlotTrack A sessionTrack B sessionTrack C sessionDelegate groups who need two of theseRoom and capacityModeratorChangeover time

Open the tool: Event brief builder

Handle it in-house, or bring in help?

Your team can usually handle this when

  • Two tracks only and one dominant delegate group.
  • Rooms are similar in size and close together.
  • Committee has already agreed which sessions are must-attend.

Outside planning help earns its fee when

  • Three or more tracks, mixed groups and several rooms of different sizes.
  • Registration data suggests heavy imbalance between rooms.
  • Nobody is tracking speaker conflicts, room changes and moderators at once.

Need help building the parallel programme?

A conference project lead can run the delegate group exercise, draft the track grid and clash check with your committee, size rooms from registration data, coordinate moderators and changeovers and update the grid when speakers change. Programme content stays with your committee. Send your session list and expected numbers to scope the work.

Discuss parallel tracksOpens WhatsApp with a draft you can edit before sending. Nothing is sent automatically.Conference project lead

Questions organisers ask

How many tracks are too many?

When delegates cannot reach most of their must-attend sessions. Many events do well with two or three tracks and a shared plenary.

Should we let delegates choose sessions in advance?

Pre-selection helps size rooms but is an estimate. Keep a fallback or overflow plan.

Do all tracks need the same length?

Not necessarily, but aligned start and end times make movement and breaks simpler.

Who decides which sessions are must-attend?

The programme committee, using delegate groups, not the organiser alone.

Related resources

Content record: Draft. Written from the cited sources and checked by automated rules; not yet independently reviewed.