Event decision log builder
Your committee keeps meeting and the same decisions keep coming back, with nobody sure which ones are holding up the rest.
Opens WhatsApp with a draft you can edit before sending. Nothing is sent automatically.
…
The short answer
This builder keeps a decision log with an owner role, a decide-by date, the options and a status of undecided, approved or rejected. It works out which undecided decisions are overdue and which ones other decisions are waiting on.
Undecided stays undecided. A missed date makes a decision overdue, never approved or rejected, and the label updates whenever a date or status changes.
How to enter decisions
- Give each decision a short ID such as D1 or D2.
- Name the decision and the owner role who will bring it to the committee.
- Add the options being considered and a decide-by date if you have one.
- Leave the status at Undecided until someone with authority records approved or rejected.
- In Depends on, list the IDs that must be decided first, separated by commas.
How status is worked out
- Approved and rejected are shown as recorded.
- Undecided with a date before the review date is Overdue, with the number of days.
- Undecided with a date on or after the review date is not yet due.
- Undecided with no date is flagged as having no due date.
- The review date defaults to today. Set it to see the log as it would look on another day.
Blocking and blocked decisions
If decision D2 depends on an undecided D1, D2 is shown as waiting on D1 and D1 is shown as holding D2 up. This points the committee at the decision to settle first.
A decision that depends on a rejected decision is flagged for review. Self-links, unknown IDs and circular dependencies produce a warning rather than an error.
Limits
The log records decisions. It does not make them, and it does not say who is entitled to approve something.
Open questions from your event brief are a good place to start the log, and the milestone back-planner can supply dates to decide by.
Worked example · Fictional example
A fictional five-decision log
Fictional decisions and dates, with a review date of 7 October 2026.
Approving the conference date was due on 30 September and is still undecided, so it is overdue by 7 days and is holding up the venue choice. The venue choice in turn holds up the AV supplier.
The ticket price is approved and stays approved even though its date has passed. The hybrid decision has no date and is flagged. Counts: one approved, four undecided, one overdue, two blocked.
Use this yourself
Decision log worksheet
Keep this table in your committee papers and update it after every meeting.
| ID | Decision | Owner role | Decide by | Options | Status | Depends on |
|---|---|---|---|---|---|---|
| D1 | Undecided | |||||
| D2 | Undecided | D1 | ||||
| D3 | Undecided | D2 |
Handle it in-house, or bring in help?
Your team can usually handle this when
- The committee meets regularly and one person keeps the log current.
- Few decisions depend on each other.
Outside planning help earns its fee when
- Decisions are reopened because nobody recorded who decided what.
- Several decisions block each other and nobody has the authority to break the knot.
- A project lead is needed to prepare options and bring each decision to a close on a set date.
Need someone to run decisions to a close?
A conference project lead can prepare the options, bring each decision to your committee on its date and keep the log current, with authority to approve staying with your people. Bring the log with its overdue and blocking items showing.
Questions organisers ask
Does a missed due date change a decision to rejected?
No. It becomes Overdue and stays undecided. Only a recorded status of approved or rejected changes the outcome.
What if I edit a due date?
The label is recalculated each time from the review date, due date and status, so the same inputs always give the same result.
Can a decision depend on several others?
Yes. List their IDs separated by commas. It shows as waiting on every undecided one.